IIYama
Izbor filtera
Najprodavaniji artikli
IIYAMA 24" XUB2492QSU-B1 (23.8") QHD (2560×1440) IPS, Pivot, 100Hz, 0.5ms, 300cd/m2, HDMI/DP, 3×USB 3.2/USB-C, zvučnici, 74523
Šifra: 74523
Dostupnost artikla: Artikl je dobavljiv
Ostvarite 10% popusta na virmansko, gotovinsko i crypto plaćanje. Popust se obračunava na kraju narudžbe.
24” QHD IPS technology panel with USB hub, 100Hz refresh rate and height adjustable standStylish edge-to-edge design makes the ProLite XUB2492QSU offering QHD (2560x1440) resolution is perfect for multi-monitor set-ups. The IPS panel technology offer
198,23 €
Sviđa mi se (0)
IIYAMA 24" XUB2495WSU-B7 (1920x1200) IPS 16:10, Pivot, 75Hz, 300cd/m2, 1000:1, 4ms, HDMI, DP, Speakers, USB-A 3x, USB-Cx1, 75821
Šifra: 75821
Dostupnost artikla: Artikl je dobavljiv
Ostvarite 10% popusta na virmansko, gotovinsko i crypto plaćanje. Popust se obračunava na kraju narudžbe.
24” 3-side borderless monitor featuring IPS (In-Plane-Switching) panel with a 16:10 aspect ratio and height-adjustable standProviding excellent performance for graphics applications in CAD, and ideal for Universities, Corporate and Financial Markets.
203,35 €
Sviđa mi se (0)
IIYAMA 27" GB2771QSU-B1 QHD (2560x1440) IPS Pivot 16:9, 200Hz, 350 cd/m2, 1200:1, 0.5ms, HDMIx2, DP, USB HUBx4, zvučnici, 78326
Šifra: 78326
Dostupnost artikla: Artikl je dobavljiv
Ostvarite 10% popusta na virmansko, gotovinsko i crypto plaćanje. Popust se obračunava na kraju narudžbe.
Diagonal 27", 68.6cmPanel Fast IPS, haze 25%Native resolution 2560 x 1440 @200Hz (3.7 megapixel WQHD, DisplayPort)Aspect ratio 16:9Panel brightness 350 cd/m2 Static contrast 1200:1 Advanced contrast 80M:1Response time (MPRT) 0.5msViewing zone horizon
237,01 €
Sviđa mi se (0)
IIYAMA 27" X2791HS-B1 FHD (1920x1080) IPS, 120Hz, 1ms, 350cd/m2, 1500:1, Speakers, HDMI, DP, Speakers, 78117
Šifra: 78117
Dostupnost artikla: Artikl je dobavljiv
Ostvarite 10% popusta na virmansko, gotovinsko i crypto plaćanje. Popust se obračunava na kraju narudžbe.
DISPLAY CHARACTERISTICSDesign4-side slim bezelDiagonal27", 68.6cmPanelIPS panel technology LED, matte finishNative resolution1920 x 1080 @120Hz (2.1 megapixel Full HD)Aspect ratio16:9Panel brightness350 cd/m2Static contrast1500:1Advanced contrast80M:
146,45 €
Sviđa mi se (0)
IIYAMA 27" XB2793QSU-B1 QHD (2560x1440) IPS 16:9, Pivot, 350 cd/m2, 1000:1, 1ms, HDMI, DP, USBx2, zvučnici, 76905
Šifra: 76905
Dostupnost artikla: Artikl je dobavljiv
Ostvarite 10% popusta na virmansko, gotovinsko i crypto plaćanje. Popust se obračunava na kraju narudžbe.
Designed to support your productivity, the ProLite XB2793QSU helps you stay focused and efficient throughout the day. The 27 QHD resolution (2560×1440) provides more space to work, letting you view documents side by side, edit with precision or keep
205,06 €
Sviđa mi se (0)
IIYAMA 27" XB2797HSU-B1 FHD (1920x1080) 120Hz, Pivot, 350cd/m2, Speakers, HDMI, DP, 1ms, USB-Ax2, USB-Cx2, 77037
Šifra: 77037
Dostupnost artikla: Artikl je dobavljiv
Ostvarite 10% popusta na virmansko, gotovinsko i crypto plaćanje. Popust se obračunava na kraju narudžbe.
Design 4-side slim bezelDiagonal 27", 68.6cmPanel IPS Panel Technology LED, matte finishNative resolution 1920 x 1080 @120Hz (2.1 megapixel Full HD)Aspect ratio 16:9Panel brightness 350 cd/m2Static contrast 1500:1Advanced contrast 80M:1Response time
193,09 €
Sviđa mi se (0)
IIYAMA 27" XB2797QSN-B1 QHD (2560x1440) IPS Pivot, 75Hz, 350 cd/m2, 1000:1, HDMI, DP, USB-Ax2, USB-Cx2, USB-C dock(PD 65W, LAN, DP out), RJ45, zvučnici, 78055
Šifra: 78055
Dostupnost artikla: Artikl je dobavljiv
Ostvarite 10% popusta na virmansko, gotovinsko i crypto plaćanje. Popust se obračunava na kraju narudžbe.
27” QHD monitor with USB-C docking and LAN that simplifies your daily setupDesigned for modern professionals who value efficiency and a clutter-free workspace, the ProLite XB2797QSN brings advanced connectivity and high-quality visuals together in a
293,92 €
Sviđa mi se (0)
IIYAMA 27" XUB2797UHSNP-B1 4K UHD(3840x2160) IPS 16:9, Pivot, USB-C Dock (LAN/96W PD/DP-OUT), 4ms, 350cd/m2, RJ45, KVM, HDMI, DP, Speakers, USB HUB (3x3.2+1xC), 75823
Šifra: 75823
Dostupnost artikla: Artikl je dobavljiv
Ostvarite 10% popusta na virmansko, gotovinsko i crypto plaćanje. Popust se obračunava na kraju narudžbe.
27’’ 4K IPS technology panel with RJ45 (LAN), KVM Switch and USB-C Dock with 96W power deliveryDiscover the XUB2797UHSNP, a 27’’ 4K IPS panel equipped with USB-C dock (96W PD), KVM switch, and RJ45 for LAN connectivity. The KVM switch allows to conne
388,14 €
Sviđa mi se (0)
IIYAMA 32" GB3272QSU-B1 QHD (2560×1440) IPS 16:9, 180Hz, 400 cd/m2, 1000:1, 0.5ms, 2×HDMI/DP, 4×USB, HAS, zvučnici, 75913
Šifra: 75913
Dostupnost artikla: Artikl je dobavljiv
Ostvarite 10% popusta na virmansko, gotovinsko i crypto plaćanje. Popust se obračunava na kraju narudžbe.
Unleash your full gaming potential with the 180Hz GB3272QSU Red Eagle guaranteeing 0.5ms MPRTStay sharp and in controls with the 32” GB3272QSU Quad HD Fast IPS gaming monitor that delivers speed, clarity, and precision for those who demand both smoot
290,50 €
Sviđa mi se (0)
IIYAMA 34" GCB3484WQSU-B2 UWQHD (3440×1440) VA Curved 1500R 21:9, HDR400, 200Hz, 450 cd/m2, 4000:1, 0.6ms, 2×HDMI/DP, 2×USB-A/2×USB-C, PiP, DUAL MODE, zvučnici, 79677
Šifra: 79677
Dostupnost artikla: Artikl je dobavljiv
Ostvarite 10% popusta na virmansko, gotovinsko i crypto plaćanje. Popust se obračunava na kraju narudžbe.
DISPLAY CHARACTERISTICSDesign curvedDiagonal 34", 86cmPanel VACurved 1500RNative resolution 3440 x 1440 @200Hz (4.9 megapixel UWQHD, DisplayPort)Dual mode 1728 x 720 @400HzAspect ratio 21:9Panel brightness 450 cd/m2Static contrast 4000:1Advanced cont
361,03 €
Sviđa mi se (0)
IIYAMA 34" GCB3486WQSCP-B1 UWQHD (3440x1440) VA Curved, 240Hz, 1500R 21:9, 500 cd/m2, 4000:1, 0.4ms, 2×HDMI/DP, USB-C Dock 95W, USB-Hub, RJ45, KVM, PiP, PbP, zvučnici, 76183
Šifra: 76183
Dostupnost artikla: Artikl je dobavljiv
Ostvarite 10% popusta na virmansko, gotovinsko i crypto plaćanje. Popust se obračunava na kraju narudžbe.
DISPLAY CHARACTERISTICSDesign curvedDiagonal 34", 86.4cmPanel VACurved 1500RNative resolution 3440 x 1440 @240Hz (4.9 megapixel UWQHD, DisplayPort)Aspect ratio 21:9Panel brightness 500 cd/m2Static contrast 4000:1Advanced contrast 80M:1Response time (
489,83 €
Sviđa mi se (0)
IIYAMA 34" XCB3497WQSNP-B1 UWQHD (3440×1440) curved VA, 21:9,350 cd/m2, 3000:1, HDMI x2, DP, USB-C dock, RJ45, KVM switch, HAS 15cm, 74410
Šifra: 74410
Dostupnost artikla: Artikl je dobavljiv
Ostvarite 10% popusta na virmansko, gotovinsko i crypto plaćanje. Popust se obračunava na kraju narudžbe.
- Dizajn: zakrivljen (1500R)- Dijagonala: 34" (86,7 cm)- Panel: VA, mat završna obrada- Rezolucija: 3440 × 1440 (UWQHD) @ 120 Hz (preko DisplayPort i USB-C)- Omjer stranica: 21:9- Osvjetljenje: 350 cd/m2- Kontrast (stat.): 3000:1 | (dinamički): 80M:1
405,09 €
Sviđa mi se (0)
